MELİORASİYA İŞLƏRİ

1) SEDEREK INFRASTRUCTURE WORK.

All infrastructure works of the Sederek district of  Nakhchivan Autonomous Republic were carried out by our company DIZAYN HOLDING.

Sederek district has an area of ​​151.34 km². The population is 16,300. The house number is 3700.

A) In this district, as a sewage work by our company; Ø100 = 26.000 - Ø200 = 105.000 - Ø300 = 7.500 -      Ø400 = 2.900 - Ø500 = 1.000 mt in total with a total of 142,400 mt canalization was opened and of pipes were produced.

B) In this district, as a potable water work by our company; Ø63 = 57.000 - Ø90 = 42.000 - Ø110 = 12.000 - Ø160 = 5.000 - Ø225 = 4.500 - Ø280 = 3.500 - Ø400 = 2.000 - Ø450 = 5.000 mt (12 ATM), Ø400 = 6800 mt (20 ATM) Mt canalization was opened and pipes were produced.

C) For potable water supply 15 pieces of 120 mt deep artesian wells were constructed .

D) 2 pieces of 10.000 m³ capacitively water reservoirs were constructed.

E)For sewage one piece of purification plant and cleaning plant consist of one piece of stilling, sunk, chlorination poll for potable wateris going on

 

2) KANGARLI INFRASTRUCTURE WORK.

All infrastructure works of the Kangarli district of the Nakhchivan Autonomous Republic were carried out by our company DIZAYN HOLDING.

Kangarlihas an area of ​​151.34 km². The population is 32.200. The number of houses 8000.

a) In this district, as a sewage work by our company; F 100=16.000 - Ø200=72.500 - Ø300=1.500 - Ø400=5.000 - Ø500=600 4.500=5.000 mt in total with a total of 104.500mtcanalization was opened and producing is going on.

bIn this district, as a potable water work by our company; Ø63=92.000 - Ø90=110.000 - Ø110=9.000 - Ø160=11.000 - Ø225=4.000 - Ø280=11.000 - Ø355=3000 - Ø400=2.500 - Ø450=2.500 MT and 12 Mt for a total of 245.000 ATM canalizations were opened and 12 ATM pipe producing is going on.

c) For potable water supply 15 pieces of 120 mt deep artesian wellsconstruction is being done.

d) 2 water reservoir with a capacity of 17.500 m3 were made.

e) For sewage one piece of purification plant and cleaning plant consist of one piece of stilling, sunk, chlorination poll for potable water is being done

 

3) INFRASTRUCTURE WORKOF TUMBUL ADMINISTRATIVE UNIT OF NAKHCHIVAN CITY

All infrastructure works in in Tumbul Administrative Unit of Nakhchivan Citywere carried out by our company DİZAYN HOLDİNG.

Tumbul Administrative Unit has an area of 57 km2. The populationis 2003. The number of houses503 .

a)  In this district, as a sewage work by our holding; F 100=2.600 - Ø200=10.200 - Ø300=1.800 - Ø500=3000 mt total of 17.600 MT canalization were opened and of pipes were produced.

b)  In this district, as a potable water work by our company; Ø90=6.600 - Ø110=8.000 - Ø160=2000 - Ø225=1.800 mt (12 ATM) , total of 18.400 mt canalization were opened and of pipes were produced

c) drinking water and sewer house connections of503house  were made.

 

4) NAKHCHIVANCİTY WASTEWATER TREATMENT PLANT.

Purification plant covering the constructions of bilogical and chemical plants of Nakhchivancity wastewater treatment plant is being done by our company DIZAYN HOLDING

The intake structure is covering the fine grid, grit chamber, parshall weirs of the distribution structure, preliminary settling tanks, bioreactors, aeration ponds, anaerobic pool, sedimentation ponds and final discharge line, collection tank sludge, polyelectrolyte preparation unit, / system, sludge unit,laboratory automation system, valve chamber, irrigation water tank, chlorination tank, generator and transformer buildings, electrical control room, mechanical room, the construction of the administration building.

The construction is in the final stage and in-service

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 